Daewoo Heavy Industries Mega 500-V — Axle (ZF AP 420R)

5. Guide the complete internal gear over the splines of the hub carrier. At the same time pay attention to the overlapping of the oil holes (hub carrier, internal gear carrier), (see Arrows). NOTE: During these steps it is absolutely necessary to respect the centric location of the hub to make a correct reassembly of the internal gear - internal gear carrier possible, and to avoid a damage of the two O-rings. Figure 127 6. Tighten slotted nut while continuously turning of the hub. NOTE: Torque limit: AP-407/409 = 800 - 1,000 Nm (590 - 740 ft lb) AP-411/415 = 1,300 - 1,500 Nm (960 - 1,105 ft lb) AP-417/420 = 2,000 - 2,200 Nm (1,475 - 1,620 ft lb) NOTE: See “Special Tools” on page 15.

Figure 128 7. Install lock plate and secure slotted nut. Figure 129 8. Assemble stub shaft until contact is obtained. Figure 130 S0602170K Page 65 Axle (ZF AP 420R)