Daewoo Heavy Industries Mega 500-V — Axle (ZF AP 420R)

E. Secure the two adjusting nuts. Figure 238 F. Tilt differential carrier. G. Insert lock plate until contact is obtained and caulk it on the drive flange. NOTE: See “Special Tools” on page 15. Figure 239 H. Cover flange-mounted surface with the sealing compound Loctite #573. I. Screw in the two adjusting screws and place the differential carrier against the axle housing until contact is obtained. NOTE: See “Special Tools” on page 15. Figure 240 J. Fasten differential carrier on the axle housing using hex. head screws. NOTE: Cover threads of hex. head screws with sealing compound. NOTE: Now, install stub shafts again and complete the final drive. NOTE:

Before the Axle is put into Service follow the “Lubrication Instructions” on page 8 Figure 241 S0602170K Page 104 Axle (ZF AP 420R)