2. Pre-assemble and install Spur gear K2 (Figure 236 - Figure 245) A. Supercool gear wheel 1 (about -80˚C (-112˚F)) and heat gear wheel 2 (about 120˚C (248˚F)). Squeeze snap ring in (Arrow), preload, and join both parts together using hydraulic press until the snap ring snaps into the annular groove of the gear wheel 2. Figure 236 B. Adjust Axial play – Spur gear bearing 0.05 - 0.15 mm (0.0020 - 0.0059 in) (Figure 237 - Example C). C. Figure 237, shows the components of the spur gear bearing. Figure 237 D. Place spur gear over the inner bearing race.
Figure 238 S0607080K Page 105 Transmission and Torque Converter (ZF 4WG-310) Reference Number Description 1 Bearings Inner Race 2 Shim (Optional) 3 Spur Gear Compl. 4 Inner Bearing Race