Daewoo Heavy Industries Mega 500-V — Transmission and Torque Converted (ZF 4WG-310)

4. Supercool the pump to about -80˚C (-112˚F). 5. Install two adjusting screws and introduce pump until contact is obtained. NOTE: Pay attention to the radial installation position. CAUTION! Use protective gloves. Figure 350 6. Install O-ring (Figure 351) and mount pump flange. Figure 351 7. Fasten pump flange, resp. the pump using hex. head screws. NOTE: Torque limit (M12/8.8) 79 Nm (58 ft lb). NOTE: Wet thread of the two hex. head screws, (Position, see Arrows) with Loctite #243 (through holes). Figure 352 8. Insert O-ring (Figure 353) into the annular groove and grease it. Fasten pump flange (power take-off) with hex. head screws. NOTE: Torque limit (M14/8.8) 125 Nm (92 ft lb).

Figure 353 S0607080K Page 141 Transmission and Torque Converter (ZF 4WG-310)