Daewoo Heavy Industries Mega 500-V — Transmission and Torque Converted (ZF 4WG-310)

Figure 382 8. Insert needle sleeve (Figure 383), with the reinforced shell facing the pressing-in tool until contact is obtained. Figure 383 9. Install two adjusting screws and mount gasket (1, Figure 384). 10. Install converter safety valve (disk, compression spring and ball), see (2, Figure 384). Squeeze both rectangular rings into the annular grooves of the input shaft and engage them (3, Figure 384). 11. Now, grease rectangular rings and align them centrically. Figure 384 12. Supercool oil feed flange, (about -80˚C (-112˚F)) and make shim s = 1.05 mm (0.0413 in) (see Example, page 149) adhere with assembly grease in the bearing bore.

Figure 385 S0607080K Page 150 Transmission and Torque Converter (ZF 4WG-310)