Daewoo Heavy Industries Mega 500-V — Transmission and Torque Converted (ZF 4WG-310)

2. The following illustrations describe the reassembly, resp. the setting of the Inductive transmitter N engine (14, Figure 401). The reassembly of the Inductive transmitter N turbine (6, Figure 401) and N central gear train (39, Figure 401) has to be carried out accordingly. I X "S" AHS3480S Figure 403 IMPORTANT Pay attention to the different Setting dimensions "X." Inductive transmitter N-Engine (14) X = 0.5 + 0.3 mm (0.0197 + 0.0118 in ) Inductive transmitter N-Turbine (6) X = 0.5 + 0.3 mm (0.0197 + 0.0118 in ) Inductive transmitter N-Central gear train (39) X = 0.3 ±0.1 mm (0.0118 + 0.0039 in ) 3. Set Dimension X using adjusting disk(s) (Figure 404 - Figure 410). A.

Measure Dimension I from the contact face to the screw-in face on the inductive transmitter. NOTE: Dimension I e.g. 30.00 mm (1.1811 in). Figure 404 B. Rotate counting disk radially until one tooth tip is central to the inductive transmitter bore. C. Screw the plug gauge in until contact is obtained. Position anvil on the tooth tip until contact is obtained and lock it using set screw (Figure 405and Figure 406). Figure 405 S0607080K Page 156 Transmission and Torque Converter (ZF 4WG-310) "A"