Return to Master Table of Contents 7. Place continuous backup ring in warm water. See Figure 21. Water temperature should be 30 - 50˚C (86 - 122˚F). Leave ring in water for 2 - 3 minutes. Slide continuous backup ring (2, Figure 20) over cylinder head and into its groove. Figure 21 8. Install an O-ring over each of backup rings. See Figure 22. Figure 22 9. Use a seal installing jig to install dust seal into cylinder head. See Figure 23. Install snap ring. Figure 23 S0705010 Page 16 Cylinders