. OPERATION OPERATION 3 - 96 INSTALLING THE ATTACHMENT 1. Pull l ock ( A) o f th e quick coupl attachme witch direction of the arro w (c) , an d pus h in to RELEASE position (a). 2. Chec k that the coupler plunger is completely pulled in. 3. Tilt th e coupler forward, driv e the machin e slowly forward and set so that the attachment h ook is aligned with the puller t ube. 4. Raise coupler connect attachmen t hook, t hen rais rises slight ly of f the ground. 5. Chec k that the attachment i s horizontal to the l eft a nd right and that e ach h ook is c orrectly i nserted. tube until the