. OPERATION TRANSPORTATION Lifting work can be carried out only for machines with lifting marks. Before starting the lifting operation, stop the is horizontal, NOTICE 3 - 119 machine in a ho rizontal place and d o as fo llows 1. Start the en gine, make s ure t hat the machine then set the work equipment to the tra For details, see "MOVING THE MACHINE (A): 40 - 50 cm (16 - 20 in 2. Check that the work equipmen t contr ol lever i s at the H OLD position, the n set the wor k equipment lock leve r to OCK position. 3.
Stop the en gine, check t hat th e area around the operator's compartmen t is safe, the n lock with th e frame l ock bar s o that the front fra me and rear f rame do not articulate . 4. Use wire ro pes and sling s that match the weig ht of the m achine, and wind the w ire rope and fix it to t he lifting points as sh own in the fig ure. Use protectors , etc. so that th e wire ropes w ill not be b roke n at s harp e dges or narrow place Use spreaders and bars havin g sufficient wi dth so tha t the y will not touch the machine. For machines e quipped with a rear f ull fende r, remove the rear fu ll fender before carrying ou 5.
After setting the wire rope s, lift u p the machine a nd stop a t 100 to 200 mm (3.9 to 7.9 in) above the gro und, and check that t he wire ropes are n ot slac k and the machine is level, then lift up slow ly.