Isuzu — Isuzu N Series Training Manual

4. Press in the bearing outer race of the idle gear shaft and rear output gear shaft. Use a press machine to press in the ball bear- ing. Use the installer 5-8840-2773-0 and the grip 5- 8840-0007-0 to press in the front side outer race of the idle gear shaft. Use the installer 5-8840-2235-0 and the grip 5- 8840-0007-0 to press in the rear side outer race of the idle gear shaft. Use the installer 5-8840-2772-0 and the grip 5- 8840-0007-0 to press in the front & rear side outer race of the rear output gear shaft. N7A0470E After installing the ball bearing, install the sleeve in accordance with the marked direc- tion. Caution: Make sure to install in the correct direction. 7.

Assemble the input gear shaft. Before installing the front side ball bearing, in- stall the needle bearing, transfer low gear and thrust washer. N7A0468E 5. Install the front & rear bearing inner race of the idle gear shaft. Before installing the rear side ball bearing, in- stall the sleeve, needle bearing, transfer high gear and thrust washer. Use a press machine to press in the roller bear- ing. Caution: Install the sleeve by turning the side, which has a groove along its outer circumference, toward the front side. Use a press machine to press in the ball bear- ing. N7A0469E 6. Assemble the front output gear shaft.

Before installing the ball bearing, install the needle bearing, front output drive gear, thrust washer and collar. N7A0471E