Notice: Coolant temperature gauge and fuel gauge cannot be removed as a single unit since they are integrated into the meter assembly. Refer to “Meter Assembly” in this section. 2. Remove the meter plate (2) and meter glass (3). Remove the two installing screws on the meter surface. Remove the meter plate by pushing the catch- es with your finger. N8A0339E Removal Preparation: Disconnect the battery ground cable. Except 4HK1-TC 1. Meter Assembly Refer to “METER ASSEMBLY” in this section. 2. Meter Glass Remove it by pushing the catches with your finger. 3. Coolant Temperature Gauge Remove six screws securing the meter at the back side.
N8A0485E Installation To install, follow the removal steps in the reverse order. N8A0340E For 4HK1-TC 1. Remove the meter assembly (1). Terminal symbol Resistance value IG — U 169 Ω±10% U — E 333 Ω±10% IG — E 242 Ω±10%