Isuzu — Isuzu N Series Training Manual

N6A0268E N6A0270E 4. Install the two collars (3) and the new bushing (4) to the setting bar (5). Align the bushing clinch line and the collar setting marks. Tighten the nut (6). Reassembly 1. Piston 2. Piston Pin Snap Ring Use a pair of snap ring pliers to install the piston pin snap ring to the piston. N6A0269E N6A0271E 3. Connecting Rod 1) Clamp the connecting rod in a vise. Take care not to damage the connecting rod. 2) Install the connecting rod so that the piston head front mark (1) and the connecting rod forging mark (projecting) (2) are set in the same direction. 5. Use the bench press to press the new bushing into position inside the connecting rod.

Check that the bushing oil holes and the connect- ing rod oil holes are aligned. 6. Use a pinhole grinder to finish the new bushing. Connecting Rod Small mm (in) End Bushing Inside Diameter Except 4HE1-TC 36.012 — 36.022 (1.4178 — 1.4182) 4HE1-TC 40.012 — 40.022 (1.5753 — 1.5767)