Isuzu — Isuzu N Series Training Manual

2. Full needle valve lift confirmation 4. Second nozzle opening pressure confirmation Confirm the full needle valve lift in accordance with the closed method. 3. Pre-lift confirmation Confirm the second nozzle opening pressure in accordance with the closed method. 5. Second nozzle opening pressure adjustment Confirm pre-lift in accordance with the closed method. Adjust the second nozzle opening pressure us- ing the shim. 6. Final inspection Caution: If not as specified, replace the nozzle assembly, lift piece, pins and spacer using the nozzle service kit. Confirm the condition of the fuel spray with the nozzle and nozzle holder assembled.

Adjustment Service Data (4HG1-T only) First nozzle opening pressure adjustment 1. Clamp the nozzle holder in a vise. 2. Install the shim, first spring and spring seat in the nozzle holder. N6A0860E N6A0861E Legend 1. Nozzle holder body Legend 1. Spring seat 2. First spring 3. First nozzle opening pressure adjusting shim Nozzle needle valve full-lift Nozzle needle valve pre-lift Nozzle pressure 1st Stage 2nd Stage 0.30 mm (0.0118 in) 0.04 mm (0.0016 in) at 19.1 MPa (195 kg/cm2, 2,770 psi) 18.1 MPa (185 kg/cm2, 2,630 psi) 22.1 — 23.0 MPa (225 — 235 kg/cm2, 3,200 — 3,342 psi) at lift 0.09 mm (0.0035 in) = pre lift + 0.05 mm (0.0020 in)