8. Turbochager (5) Compressor impeller installation 1) Fit compressor impeller 18 onto turbine shaft 1. 2) Set a box spanner (10 mm) on the turbine side end of turbine shaft 1, and tighten shaft end nut 19. Note: Since the shaft end nut has left-handed screw, pay attention to the tightening direction. Tightening torque: 2.0 0.2N-m (20 2kgf-cm) (6) Turbine housing installation 1) Install bearing housing 15 on turbine housing 11 by aligning the match marks put before disassembly. Note: In case of part replacement, check the oil inlet and outlet positions and the exhaust gas inlet position before reassembly. 2) Install the turbine side keep plate and tighten M8 hexagon bolt 12.
Tightening torque: 285 10N-m (28 1kgf-cm) (7) Compressor housing installation 1) Apply liquid gasket (Three Bond No.1207) on the compressor side flange of bearing housing 15. Note: See section (4)3) for the portion to be applied. 0.2 mm 2) Check the mark and install the compressor housing 7 on the bearing housing 15. Applying thickness: 0.1 Note: When a part is replaced, confirm a position of an oil entrance and a position of an air exit, and assemble it. 3) Install the keep plate 10 on compressor side, and tighten M8 hexagon bolt 8. Tightening torque: 48 N-m (4.7 0.5kgf-cm) (8) Rotor play measurement See the inspection procedure in section 8.3.2 for the measurement method.
If the rotor play does not satisfy the standard, reassembly is necessary since assembly error or use of a wrong part is conceivable. Service standard of rotor play in axial direction 0.06mm RHB51 RHF5 0.03 0.053mm 0.06mm RHB31 0.03 0.022 Service standard of rotor play in radial direction 0.13mm RHB51 RHF5 0.08 0.13mm RHB31 0.08 0.061 0.093mm 136