Komatsu — BREAKING-IN THE NEW MACHINE

OPERATION OPERATION AFTER STARTING ENGINE After starting the engine, do not immediately start operations. First, carry out the following operations and checks. G Emergency stop If there has been any abnormal actuation or trouble, turn the starting switch key to the OFF position. G If the work equipment is operated without warming the machine up sufficiently, the response of the work equipment to the movement of the control lever will be slow, and the work equipment may not move as the operator desires, so always carry out the warming-up operation. Particularly in cold areas, be sure to carry out the warming-up operation fully.

BREAKING-IN THE NEW MACHINE NOTICE Before operating the machine for the first time, confirm that cooling water is in the radiator. If the machine is delivered without cooling water in the radiator, completely clean the inside of the radiator by flowing city water through the radiator, then fill the radiator with cooling water. CAUTION Your Komatsu machine has been thoroughly adjusted and tested before shipment. However, operating the machine under severe conditions at the beginning can adversely affect the performance and shorten the machine life. Be sure to breaking-in the machine for the initial 100 hours (as indicated by the service meter).

During breaking-in operations, follow the precautions described in this manual. G Run the engine at idling for 15 seconds after starting it. During this time, do not operate the control levers or fuel control dial. G Idle the engine for 5 minutes after starting it up. G Avoid operation with heavy loads or at high speeds. G Avoid sudden starts, sudden acceleration, sudden steering and sudden stops except in cases of emergency. 3-84 WARNING