. OPERATION TROUBLES AND ACTIONS LIGHTWEIGHT TOWING HOLE WARNING objects. SEVERE JOB CONDITION 3 - 192 The sh ackle must always be u sed. Hold th e wire rope level a nd d irect it strai ght to the track Move t he machine slowly and be c areful not to app ly any sudden load to the wire There is a hole in th e track frame t o fit the shackle when towing light Permissi ble towing load: Max .
49,000 N (5,000 When carrying o ut digging operations in wate r, if th e work equipment mou nting pin goes in to the water, c arry out greasi ng every t ime th e operation is carried o For he avy-duty operations and deep digging, carry out greasing of the wor k equipment mo unting pins ev ery time before operation After g reasing, o perat e the boom, ar m and b ucket several times, then gre