Komatsu — Full page photo print Komatsu

. MAINTENANCE MAINTENANCE PROCEDURE CHANGE OIL IN SWING MACHINERY CASE WARNING engine is stopped and may cause serious burns. oil CASE, ADD OIL (PAGE 4-49)". 4 - 64 Parts temperature to go do wn before performing this operation. ait for the Refill capacity: 4. 5 liters (1.19 US g 1. Remove cover (A) of the inspectio 2. Set a container under drain valve (P) under the machine body t 3. o catch the oil. Loosen drain v alve (P) under the body, drain the oil, then n valve again. t ighten the drai REMARK If the oil forms th in threads, there is no problem in stopping the draining operatio n.

In low temperatu temperatureslig res, swing the wor htly before starting t k equipment t he operationt o raise th o drain th e oil e oil. However, never swing the work eq uipment durin g the draining operation. This will cause breakag e of the swing machine ry. 4. Remove the ca p of oil filler (F), the n add th e replacement amount of oil th rough oil fill 5. ee"CHE