12. OPERATION 3. Sling the bucket link, then pull out the bucket link pin. Secure the bucket link to the tilt lever with wires. 4. Pull out and remove bucket hinge pin 5 on both sides of the bucket. 5. Disconnect lift arm and bucket. 2-96
12. OPERATION 3. Sling the bucket link, then pull out the bucket link pin. Secure the bucket link to the tilt lever with wires. 4. Pull out and remove bucket hinge pin 5 on both sides of the bucket. 5. Disconnect lift arm and bucket. 2-96