Komatsu — 12.19 REMOVAL AND INSTALLATION OF THE BUCKET

12. OPERATION 7. Install retainer 7 to bucket hinge pin 5 , then measure clearance B between the end face of the retainer and the bucket hinge boss. 8. Select the number of shims so that clearance B is 0.2 mm (0.008 in) or loss, then add one 0.2 mm (0.008 in) shim, and assemble. 9. Move cord ring 2 down to the groove. 10. Use the same procedure as in steps 1 – 9 to install the bucket link pin. Assemble a pin that has no grease hole at the bucket link. 11. Coat the bucket hinge pin and bucket link pin with grease. For details, see “24.5 EVERY 100 HOURS SERVICE”. For details of removing and installing the bucket, please contact your Komatsu distributor. 2-98