. OPERATION OPERATION 2. Blade control lever (2) to the full RAISE position, then hold the lever in position, and operate slowly to the left tilt relief and right tilt relief positions for 5 minutes. 3. Then operate blade control lever (2) to the full RAISE position (up to the lever stroke end) and hold it in that position; alternate the right and left TILT relief intermittently; lower the blade to the ground by operating the control lever to the LOWER position; operate the control lever to the FLOAT position (up to the lever stroke end); and alternate right and left TILT relief intermittently for five minutes. 4.
Lower the blade to the ground, move the control lever fully to the FLOAT position (lever stroke end) and hold the lever in position for 1 minute. Next, release the lever and check that it stays in the FLOAT position. After waiting for 3 minutes, return the lever to the HOLD position. (A) (B) (C) RAISE HOLD LOWEW (D) (E) (F) FLOAT LEFT TILT RIGHT TILT 3 - 117 STARTING IN COLD WEATH ER PERATION) n automatic warming-up device. (AUTOMATIC W ARMING-UP O PERATION) This machine is equipped with a n automatic warming -up devic When the eng ine is started, if the engin e coolant te mperature is low (below 30 out automatic The automati °C (86 °F)), the warming-up operation is carried ally.
c warming-up operation is canceled if the engine coolant temp (86 °F)) or if minutes. If t erature reaches the warming- he engine cool the specified temperature (30 up operation is continued for ant temperature or hydraulic °C 10 oil temperature are low after the automati c warming-u p operation, warm the eng ine up further a s follows. 1. Turn fuel co ntrol dial (1) to t he center position be twee n LOW IDLE (MIN) and HIGH IDL E (MAX) an d run th e engine at at medium spe ed for about 10 minutes w ith no load.