. MAINTENANCE SERVICE PROCEDURE Thread diameter of bolt to tighten Straight tilt dozer Straight tilt power pitch dozer Sigma dozer Sigma power pitch dozer Angle dozer 24 (Shim part No.: 14Y-71-22280) 27 (Shim part No.: 14X-71-51460) Power angle power tilt dozer 4 - 44 PROCEDURE FOR BLEEDING AIR IN HYDRAULIC SYSTEM See "STARTING ENGINE Since the engine must be started and the blade m ust be ope rated, see OPERATION.
NOTICE If the engine is run at high spe ed immediately after startup or a cylind er is pushed u p to it s stroke en d, air take n inside the cylinder may cause damage to the pist 1) Run the engine at l ow idle, and extend and retract ea ch cylinder 4 to 5 times, ta king care that a cylinder is not moved to the e nd of its stroke. (Stop th e cylinder approx. 100 mm (3.9 in) s hort of its stroke end) 2) Next, operate each cylinder 3 to 4 times to the end o f its stroke. 3) Finally, operate ea ch cylinder 4 to 5 times to the end of its stroke to c ompletely remove t he air. INSTALLATION OF TR UNNION CAP ent to the ground. 1. 2. 3. 4. 1. Lower the work equipm 2.
After setting the work e quipment lock lever to t he LOCK position and stop the engi 3. Install the shims. (Top, bottom: 2 places) ims: Thickness 1mm x 10 until they reach the specified torque. Standard number of sh ims: Thickness 1mm x 4. Tighten bolts (1) in turn until they reach the sp ecified torq