Hitachi Construction Machinery — PREPARATION FOR PERFORMANCE TESTS

OPERATIONAL PERFORMANCE TEST / Excavator Test DIG FUNCTION DRIFT CHECK Summary: Measure dig function drift, which can be caused by oil leakage in the control valve and boom, arm, and bucket cylinders, with the loaded bucket. NOTE: When testing the dig function drift just after cylinder replacement, slowly operate each cylinder to its stroke end to release air. Preparation: 1. Load bucket fully. In lieu of loading the bucket, weight (W) of the following specification can be used. W=3600 kg (7940 lb) 2. Position the front attachment as follows: With the arm cylinder fully retracted and the bucket cylinder fully extended.

Raise the boom so that the arm tip pin height is flush with the boom foot pin height. 3. With the arm rolled out and the bucket rolled in, hold the bucket so that the height of the bucket pin is the same as the boom foot pin. 4. Maintain the hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). Measurement: 1. Stop the engine. 2. Five minutes after the engine has been stopped, measure the change in the position of the bottom of the bucket, as well as the boom, arm and bucket cylinders. 3. Perform the measurement three times and cal- culate the average values. Evaluation: Refer to the Performance Standard Table in Group T4-2. Remedy: Refer to the Troubleshooting B in Group T5-7.

T145-05-03-020 Boom and Bucket Cylinder Retraction T110-06-03-002 Arm Cylinder Extension T110-06-03-001 T4-4-12 Mark Mark Mark Mark