Yamaha Motor Co., Ltd. YFM7FGPW — ENGINE REMOVAL

EBS00200 ENGINE ENGINE REMOVAL AIR DUCTS, MUFFLER AND EXHAUST PIPE T R . . 7 Nm (0.7 m kg, 5.1 ft Ib) 3 5 4 7 8 9 New 6 4 New T R . . 20 Nm (2.0 m kg, 14 ft Ib) 2 1 4 - 1 ENGINE REMOVAL ENG T.R. 20 Nm (2.0 m • kg, 14 ft • Ib) Order Job/Part Q’ty Remarks 1 2 3 4 5 Removing the air ducts, m exhaust pipe Front fender/rear fender Left footrest board Air filter case Meter assembly V-belt cooling duct 2 V-belt cooling duct 1 Exhaust pipe protector Spring Muffler uffler and 1 1 1 2 1 Remove the parts in the order listed. Refer to “ENGINE SKID PLATES, SEAT, CARRIERS AND FENDERS” in chapter 3. Refer to “FOOTREST BOARDS” in chap- ter 3. Refer to “AIR FILTER CASE” in chapter 3.

Refer to “ELECTRICAL COMPONENTS TRAY” in chapter 3.