Replace the meter assembly or ECU. The wiring circuit from the main switch to the meter assem- bly coupler is faulty and must be repaired. 9 - 40 SIGNALING SYSTEM ELEC – + ELEC – + 5. While the override switch is pushed, the 2. Voltage segments of the speedometer digits will not • Connect the pocket tester (DC 20 V) to the appear as shown in the illustration. meter assembly coupler as shown. Positive tester probe → brown 1 Negative tester probe → black/white 2 G/Y G/R Br/B 1. Override switch Y/L Br B/W • Check the override switch for continuity. 1 2 Refer to “CHECKING THE SWITCHES”. • Is the override switch OK? • Set the main switch to “ON”.
• Measure the voltage (12 V) of brown 1 YES NO and black/white 2 at the meter assembly coupler. • Is the voltage within specification? Replace the left han- dlebar switch. YES NO YES NO G/Y G/R Br/B Y/L Br B/W