Komatsu — EXTERNAL DISPLAY LAMPS

. ATTACHMENTS, OPTIONS HANDLING PAYLOAD METER HM total 6 - 15 ESTIMATE DISPLAY When the load changes each buck the bucket is l oaded, an d flashes the appropriate la mp to prevent overloading. The predic ted load d isplay an d actual payload d isplay are shown at t he same time payload if one more Example: expected number o f bucke t loads: 5] 1st bucke t 7 tons 2nd buck et 7 ton s (total: 1 4 tons) 3rd bucke t 7 tons (total: 21 tons) tons) tons) 4th bucke t 7 tons (total: 28 5th bucke t 7 tons (total: 35 When the machine i s loaded i n this w ay, t he ex ternal display lamps light up as s hown in the chart below.

NOTICE I f the red la mp flashes, and the sa me load as in the las t bucket is l oaded, the total load wil l exceed 105%. I f the red la mp flashes and the yel low lam p also lights up, do not l oad anything. I f the red la mp flashes and the yel low lam p also flashe s, load half a bucket. REMARK It is possible t o change t he lightin g-up conditions of the lamp b y operatin g the switch of the payloa d meter controller. Consult your Komatsu distributor before making an y changes .