Komatsu — LOADING HEAPED MATERIAL

OPERATION ORGANIZING THE WORK AREA Before starting any loading operations it is important to be sure your work area is safe and clear of any obstacles or hazards that may hinder your operations, damage the equipment or cause an accident. Check the ground to be sure it is level and stable. Study the illustration at the right of a typical loading pattern. Before starting your operations, sound the horn, and be sure all person- nel are at least 20 m (40 ft.) away from the machine and the work area. Remark When using the declutch button during loader operations always bring the machine to a full stop before chang- ing speed ranges.

LOADING HEAPED MATERIAL Use the following steps to efficiently load the bucket: 1. Level the bucket and set it on the ground. 2. Shift into a lower speed range. 3. Start moving into the pile from several feet away. 4. Once the bucket is into the pile, curl the bucket back while continu- ing to head into the pile. This action keeps the material from falling under the front of the bucket, which would lose part of the load. 5. Once the bucket is full, stop moving into the pile and begin raising the load while continuing to curl the bucket back. 6. Raise the arm just enough to allow the material in the bucket to fall toward the back of the bucket and level off. 7.

Lower the bucket back down to approximately 50 cm (20 in.) above the ground and back out of the pile of material. 8. Proceed slowly to the point of deposit. WB140PS-2N WB150PS-2N 2-47