MAINTENANCE MAINTENANCE PLAN CHECKS BEFORE STARTING MAINTENANCE EVERY 10 HOURS OF OPERATION MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION Only for machines that use HEES. Perform these operations together with those to be initiated every “50 HOURS”. 3-28 WB140PS-2N WB150PS-2N Item Description Operation Page a Various checks Check 3-32 b Fuel level Check, (add fluid) 3-32 c Coolant level Check 3-33 d Engine oil level Check 3-33 e Hydraulic oil level Check 3-34 f Water separator Drain water 3-35 Item Description Operation Page a Joints - Loader Lubricate 3-36 b Joints - Backhoe Lubricate 3-37 Item Description Operation Page a Hydraulic oil filter Only for machines using HEES Change 3-38