OPTIONAL ATTACHMENTS MULTIPURPOSE BUCKET COUPLING All coupling and uncoupling operations must be performed on flat, firm surface. Before beginning work operations, ensure the equipment installed is in good working order and installed correctly. Depending on the option ordered, two methods exist for making the connections: man- ual and hydraulic. MANUAL COUPLING 1. Rotate the lock lever handle (1) to unlock the fulcrum pin. 2. Position the machine so the support cradle is perpendicular to the equipment being installed. 3. Using the bucket control lever, position the fixed coupling pins (3) under the upper seats or hooks (4) of the bucket (5) 4.
Raise the arm (6) to engage the pins (3) in the upper seats (4) of the bucket (5). When in place, raise the bucket slightly. 5. Rotate the lock lever handle (1) to lock the fulcrum pin 6. Hook the safety restraint (7) to the handle (1). Lube all fittings after installation. WB140PS-2N WB150PS-2N 5-7