OPERATION 93 Bleeding the Cab Tilt System Note: In order to bleed the system, the cab must be in the lowered position. Note: To perform a system bleed, the following steps must be performed in the designated order: 1. Connect all hydraulic lines. 3. Tighten one connection at each latch cylinder. 2. Tighten all connections (except two) at the tilt cylinder. 4. Fill the pump reservoir to the top with MACK specified oil. CAUTION Do not refill the reservoir with the cab in the RAISE position. 5. Close and tighten the fill plug. 6. Shift the pump control lever to the LOWER position and pump until the LOWER lines are bled; also tighten the corresponding connections. 7.
Shift the pump control lever to the RAISE position and pump until the RAISE lines are bled; also tighten the corresponding connections. 8. Bleed the latch cylinders and tighten the connections. 9. Bleed the push port of the tilt cylinder and tighten the connections. 10. After the entire system has been bled, shift the pump control lever to the LOWER position; then check and refill the reservoir, if necessary. Note: The recommended type of fluid for the cab tilt system is CF-A (MIL-H-5606E); the approximate capacity is 1.4 liters (3 pints). WARNING The pump control lever must be in the LOWER position before operating the vehicle.