Komatsu — INSTALLATION

DISASSEMBLY AND ASSEMBLY COUNTERWEIGHT 12 COUNTERWEIGHT REMOVAL 1. Set lifting chain hooks to lifting eyes of counterweight and remove slack. 2. Remove mounting bolts (1). # Check the location of the shims. 3. Lift off counterweight (2). Counterweight: PC300LL ........................................ 8,182 kg INSTALLATION G Carry out installation in the reverse order of removal. # Adjust the stepped difference [top and bottom clearance] from the bodywork with shims. # Install so that the clearance between the door and counterweight and the clearance between the revolving frame and the counter- weight are a uniform 10 ± 5 mm. Thread of mounting bolt:

..................Thread tightener (LT-2) Mounting bolt: .............................................1,814 ± 98.1 Nm PC300LL-6 30-27