hyundai R60WVS Pro — 2. MAJOR COMPONENT

6. ACCELERATOR PEDAL Notes 1. It is desirable to replace seal materials, such as O-rings, every disassembling. However, they may be reused, after being confirmed to be free of damage. 6-26 Maintenance check item Criteria Remark Leakage The valve is to be replaced when the leakage effect to the system. For example, the primary pressure drop. Conditions : Primary pressure : 30 kgf/cm2 Oil viscosity : 23 cSt Spool This is to be replaced when the sliding surface has worn more than 10μm, compared with the non-sliding surface. The leakage at the left condition is estimated to be nearly equal to the above leakage. Push rod Ø7 1 mm This is to be replaced when th top end has worn more than 1mm.

Play at operating section The pin, shaft, and joint of the operating section are to be replaced when their plays become more than 2mm due to wears or so on. When a play is due to looseness of a tightened section, adjust it. Operation stability When abnormal noises, hunting, primary pressure drop, etc. are generated during operation, and these cannot be remedied, referring to section 6 troubleshooting, replace the related parts.