REMOVAL AND INSTALLATION ENGINE-PUMP GROUP REMOVAL OF THE ENGINE-PUMP GROUP 1 - Tilt the cab until it is resting on a support. (For details, see «TILTING THE CAB»). 1 2 - Remove the battery. (For details, see «REMOVING THE BATTERY»). # Drain the engine coolant liquid. Liquid: max. 9 # Drain the hydraulic oil. Oil: max. 39 2 RKSA0301 # Drain the fuel. Fuel: max. 38 3 4 1 2 3 - Remove the radiator group. (For details, see «REMO- VING THE RADIATOR GROUP»). 4 - Remove the cover of the control unit (1) and disconnect the connectors (2), (3) and (4) that connect the control unit (1) to the frame wiring harness (5). 5 RKSA0570 5 - Loosen the nuts (6) and disconnect the control unit from the frame.
6 7 6 RKSA0580 6 - Disconnect the fuel level sensor connector (8). 9 8 RKSA0590 30-25 SK714-5 SK815-5