Komatsu — ENGINE-PUMP GROUP

REMOVAL AND INSTALLATION ENGINE-PUMP GROUP 12 - Attach the engine-pump group to some hoisting tackle and apply a slight tension to the cables. 13 - Loosen the four nuts (26) that secure the engine and re- move the complete group. 3 Engine-pump group: 290 kg 26 RKSA0620 INSTALLATION OF THE ENGINE-PUMP GROUP To install, reverse removal procedure.. 1 # Adjust the stroke of the accelerator cables. (For details, see «20. TESTING AND ADJUSTMEN- TS»). 2 1 - Fill the hydraulic oil tank up to maximum level. While filling the tank, bleed the air from the pump. (For details, see «20. TESTING AND ADJUSTMENTS»). Hydraulic oil required: approx. 33 2 - Fill the coolant liquid circuit up to maximum level.

Coolant liquid: approx. 8 3 - Fill the fuel tank and bleed the air from the system. (For details, see «20. TESTING AND ADJUSTMENTS»). Fuel: max. 51.5 4 - Starttheengine to circulatetheoilandcoolantliquidand check that there are no leaks. 5 - Stop the engine, check the levels and, if necessary, top them up. 6 - Bleed the air from the hydraulic circuits and pressurise the tank. (For details, see «20. TESTING AND ADJU- STMENTS»). 3 Engine nuts: 80 Nm 30-27 SK714-5 SK815-5