REMOVAL AND INSTALLATION COMPLETE WORKING EQUIPMENT 4 - Disconnect the hoses (7) and (8). # Markthetubes toavoid exchangingthem duringre- assembly. 5 - Remove the pins (9) and (10) and remove the working equipment. # Check and make a note of the positions of the adju- stments to a given clearance. 7 9 Working equipment: approx. 470 kg RKSA0950 10 8 RKSA0960 INSTALLATION OF THE COMPLETE WORKING EQUIPMENT To install, reverse removal procedure. 1 When aligning the positions between the hole and the pin, run the engine at low idling. Do not insert fingers into the holes to check align- ment. Inside the bushings:
Litio EP MS2 NLGI 2 2 # Insert shims between the boom and the frame until the residual clearance is less than 1 mm. 1 - Start the engine to circulate the oil, and bleed the air from the circuits. # After bleeding the air, stop the engine and check the level of oil in the tank. RKS01810 30-51 SK714-5 SK815-5 1 2