Tighten the Coupling fixing bolts and nuts to specified torque. Tighten the drive shaft connecting flange fixing bolts to specified torque Install the oil delivery pipe and return EAMD021I pipe. 3.3.27. Vibration damper end pulley Install the vibration damper on the crankshaft pulley. Install the crankshaft pulley assembly on the crankshaft, then tighten the bolts and thrust washers. 3.3.28. Fan drive pulley Install the fan drive pulley onto the tim- ing gear case cover. 3.3.29. Water pump Mount a new O-ring. Install the water pump drive pinion over the PTO (power take-off) spline. Connect water pipes and by-pass pipe to the water pump. Connect a water pipe to the expansion tank.
EAMD112I - 75 - Torque 6.0 kg•m Torque 7.5 ~ 8.5 kg•m Torque 13.4 kg•m