Komatsu — LIFTING MACHINE

. OPERATION TRANSPORTATION OPERATION TRANSPORTATION machine. center of gravity of the Combination 4. After the machine comes off the ground, check the hook condition and the lifting posture, and then lift slowly. 3 - 139 1. (lifting upper stru Fit wires to boom foot pins (1) and li fting bracke nd lift th Lifting load is 26.7 tons (58,874 lb) (fuel: empty, hydraul oom foot pin (1): 160 mm (6.3 in) ole at lifting position of lifting bracket (2): 7 gravity (11 ft 1 in) mpty, hydraul oil: M level). Diameter of b oom foot pin (1): 1 60 mm (6.3 Diameter of h mm (2.8 in) bracket (G): center of (L): 3,375 mm 2.

The mark for th e center of gravit y in stalled to the machin shows the positi on of the center of gravity in the conditio conditio shown in the dia gram on the right. (M): Distance betwee n centers (horizontal) measureme 5,100mm (16 ft 3. Combination of w ire length wire is the length from the pin and center of the hole. The length of the When using th In addition, se machine. The length of the wire is the length fro m the pi n and center o f the hole. When using th e following wire, use wire of more t han the length given below In lect a wire length that will bring the lifting position directly abo ositio Unit Co (A) mm (ft in) 70,0 (B) mm (ft in) 80,0