. LOADING SHOVEL PRECAUTIONS WHEN DISASSEMBLING MACHINE PRECAUTIONS WHEN DISASSEMBLING MACHINE RELEASING PRESSURE When disassembling the machine or removing the piping during inspection or maintenance, always release the pressure as follows. Releasing Pressure from Work Equipment Circuit, Swing Circuit, Travel Circuit WARNING 7 - 13 The hydraulic system i s always under internal pressure, s o when inspecting or replacing the pipi ng or hoses, always release the pressure in the circ uit before starting. If the pressure is not released, high pressure oil may s purt out and cause serious personal injury.
The parts and oil are at high temperature after the engine is stopped, a nd may cause serious burn s. Wait for the temperature to go down before star ting the operation. When the oil filler cap i s removed, oil may spurt out, so tu rn the cap s lowly to release the pressu re before removing the cap. 1. Stop the machine on firm horizontal ground, low er the wor equipment to the gr then stop the engin Set the lock leve ound as shown in the diagram on the right e. r to FREE position. equipment control lever to the full strok s after stopping the engine. g switch at the ON position. the hydraulic tank. 2. Operate each work within 5 - 6 second Leave the startin 3. Remove the cap of 4.
Start the engine, ru n for approx. 10 seconds, then stop the e Do not run the e Set the work eq ngine at more than 1000 rpm. uipment control levers to the H OLD position. 5. Operate each work equipment control lever to the full stroke within 5 - 6 seconds afte Repeat Steps 4 - 5 three times. Releasing Pressure in Accumulator Circuit After stopping the engi ne, set lock lever to the FREE p osition, the operate each work equ ipment control lever 3 - 4 time s to the en of the stroke. After 1 m inute, the internal pressure will be relieved Do not loosen any pi ping until at least 1 minute has p assed afte relieving the internal pressure.