POWER TRAIN - POWER COUPLING Fixed coupling 42. Assemble PTO pan to housing. Clean both mating surfaces. Apply a unbroken bead (1) of Loctite 515 to bottom flange of PTO housing as shown. The bead must be held close to outside edges and as close to the bolt holes as possible. 20035882A5 35 43. Loose assemble the lube oil lines onto the gearbox to get them aligned. Once they are routed correctly torque the tube nuts to 43 - 47 Nm ( 32 - 35 lb ft ) using a 24mm open end torque wrench. Torque the lock nuts on the tee to 45 - 49 Nm ( 33 - 36 lb ft ) using a 19mm open end torque wrench. Hold the tee body with a 30mm open end wrench while torquing to prevent tube damage. 50040394 36 44.
Add ISO mounts (1) to lube lines. Torque bolts to 24 - 26 Nm ( 18 - 19 lb ft ). 20035872A5 37 9679 1 27/05/2004 C.10.B / 21