Case IH AFX8010 — PROCESS DRIVE Primary process drive

POWER TRAIN - PROCESS DRIVE Primary process drive 14. Install the electrical connector (1) to the valve, and any place else if they were removed for access. 10036391A5 14 15. Install the key into the shaft. 16. Use Loctite Brand 767 anti-sieze on the shaft before installing the pulley. Install the pulley (3) onto the shaft with the washer (2) and bolt (1) . Torque the M12 bolt to 98 Nm ( 72 lb ft ) . 17. Install the belts (1) and (2) on the pulley. 50041890A5 15 10036393A5 16 9683 1 27/05/2004 C.50.B / 18