Case IH AFX8010 — STORING AND HANDLING Grain storing

CROP PROCESSING - STORING AND HANDLING Grain storing Grain elevator housing - Assemble (K.60.B.74 - F.10.A.20) AFX8010 1. To install the grain elevator upper shaft, proceed as follows: 2. Insert shaft through the left side sheet and into one of the sprocket spacers (1) . Insert a 50 mm ( 1.97 in ) long key (2) into the shaft keyseat and slide the 9 tooth sprocket (3) on the shaft over the key. Slide the second spacer (4) on the shaft and insert the shaft into the outer bearing (5) . Install the 37 tooth sprocket (6) and 50 mm ( 1.97 in ) long key on the shaft, and retain with the two washers and cap screw (7) removed earlier.

Drive the shaft into the outer bearing using a dead-blow hammer until the inner bearing flange (8) is against the side sheet of the housing. Install three (3) M10X30 short square neck bolts in the bearing flange and fix with lock washers and nuts. Check the dimension shown and adjust shaft position in the two bearings to achieve it. Install the locking collar (9) on the right hand bearing and tighten both collars in direction of shaft rotation. Tighten hex socket set screws of lock collars with a 5mm hex Allen wrench. Install the strip-off plate (10) under the shaft and sprocket with four (4) M10X30 short square neck bolts, lock washers and nuts (11) .

The legs with bolt holes point toward the front. Install the grain elevator chain. Refer to Grain elevator Chain - Install (K.60.B.52.48 - F.10.A.15) . 50037328A5 1 3. Install and close the cover (1) . 10030024A5 2 4. Install shield (1) with six (6) M8X20 cap screws with lock washers into weld nuts; five (5) are on top and one (1) is at the bottom of the front flange. Also, three (3) M8X20 cap screws are used with nuts and two lock washers each through the side of the shield. Remove auxiliary support at the rear hinge support for the large side panel. 40033203A5 3 9716 1 27/05/2004 K.60.B / 40