Case IH AFX8010 — CLEANING Primary cleaning

CROP PROCESSING - CLEANING Primary cleaning 4. Rotate the leveling frame to make the right side accessible. Turn out cap screws (1) and remove the drive arm bushing cap (2) from the right drive arm. Turn out cap screws (3) and remove the connecting arm bushing cap. Rotate the leveling frame to make the left side accessible. Remove the left side drive and connecting arm bushing caps. 50013948 4 5. Turn out cap screws (1) several turns. Apply blows using a mallet to the head of the cap screws to force the bushings and pins from the upper shoe frame. Continue until the pins can be removed from the frame. 6.

At this point, the front of the cleaning shoe is supported by the wood blocks (2) previously set in place. 20013950 5 7. Rotate the leveling frame to make the right side accessible. Turn out the cap screws from the upper shoe frame left support arm bushing cap. 8. Rotate the leveling frame to make the left side accessible. Turn out the cap screws from the upper shoe frame left support arm bushing cap. 9. Use the help of several assistants to remove the upper cleaning shoe frame from the combine. 20013949 6 9717 1 27/05/2004 K.62.B / 54