CROP PROCESSING - UNLOADING Grain unloading 5. To begin assembly of the unloading system chain drive, first coat the surface of the tensioner idler mounting bracket with CASE AKCELA 251H EP MULTI-PURPOSE GREASE . Install flat washer and slot washer (23) on bolt (22) . Install into clevis (10) , then into a spacer, a washer, 15-tooth sprocket (5) , another washer and spacer, then through the other leg of the clevis (10) into lock nut (8) . 6. With nut loose, feed threaded end of clevis (10) into tab at tail of bracket and engage washer at head end of bolt into key slot of bracket. Torque to 174 - 220 Nm ( 130 - 160 lb ft ). Install indicator (13) , spring (14) , washer and lock nut (15) .
NOTE: All other sprockets are to be aligned with this first sprocket as they are installed. 7. Apply Loctite antiseize product 767 to bores of sprockets (12) , (18) , and (20) . Install 25-tooth sprocket (18) on unloading auger gearbox input shaft with two keys (17) and aligning by selecting quantity of washers (19) . Retain with cap screw (16) , lock washer and flat washer. Install 43-tooth sprocket (12) on rear grain tank floor auger and 38-tooth sprocket (20) on front auger shaft with washers (19) and key (11) , retaining with cap screw (9) , lock washer and flat washer. Torque these last three to 82 - 106 Nm ( 60 - 80 lb ft ) after rechecking alignment with (5) .
Install 25-tooth idler sprocket (26) on hub (25) , aligning with (5) by use of washers (24) , and retaining with bolt (27) and lock washer. Torque to 205 - 260 Nm ( 150 - 190 lb ft ). Install chain (21) . Tighten nut (15) to compress spring (14) to 110 mm ( 4.33 in ) length as shown by indicator (13) . 9723 1 27/05/2004 K.72.B / 23 6 Washer 16 Cap screw - M12X40 26 Sprocket - idler 7 Spacer 17 Key 10X8X50 27 Cap screw - M16X50 8 Lock nut - M16 18 Sprocket-unload auger 28 Washer 9 Cap screw - M12X30 19 Washer - hard 10 Clevis 20 Sprocket-front tank auger