Case IH AFX8010 — UNLOADING Grain unloading

CROP PROCESSING - UNLOADING Grain unloading 2. Install the bearing outer race (9) , spacer (8) , bearing (11) , shim (10) , spacer (6) , and retaining ring (12) on the input shaft (1) . Install the bearing outer race (9) , spacer (8) , bearing (9) , shims (10) (always a 2mm plus one variable), and retaining ring (12) on the output shaft (1) . In order to set the two bearings (9) , hit the shafts on both ends, and rotate the bearings two full revolutions to seat the bearing rollers. Check the preload on the bearings with a torque meter.

This preload should cause a rolling torque of 0.8 - 1.2 Nm ( 7 - 11 lb in ) on the pair of bearings (9) , and a torque of 0.2 - 0.6 Nm ( 2 - 5 lb in ) on bearings (9) and (11) . Adjust shimming (10) to keep preload in the ranges given. This shimming consists of a spacer and a shim selected from a shim pack set. The set contains shims of the following thicknesses: 0.3 mm (0.012 in) 0.35 mm (0.014 in) 0.4 mm (0.016 in) 0.5 mm (0.020 in) 0.6 mm (0.024 in) 0.7 mm (0.028 in) 0.8 mm (0.031 in) 0.9 mm (0.035 in) 1 mm (0.039 in) 1.5 mm (0.059 in) 2 mm (0.079 in) 2.5 mm (0.098 in) ZDA3527B 3 3. Apply bluing compound to teeth of both gears. 4.

To assemble the pre-assembled shafts in the gearbox, proceed as follows: Install the original inner shim packs (1) & (2) in the housing. Install the pre-assembled shafts completely, by pushing only on the outer races of the bearings. Check if the preload of these shafts is still within the ranges shown. IMPORTANT: Make sure the shaft with the tapered roller bearing and ball bearing is installed in the correct end of the housing (toward the vertical auger) as previously marked. 20014631A5 4 9723 1 27/05/2004 K.72.B / 43