Case IH AFX8010 — UNLOADING Grain unloading

CROP PROCESSING - UNLOADING Grain unloading 9. Shifting one shaft 0.1mm (0.004in.) will change the backlash between the gears approximately 0.05mm (0.002in.) Shims are available in the following sizes: 0.3mm (0.012in) 0.35mm (0.014in) 0.4mm (0.016in) 0.5mm (0.020in) 1.0mm (0.039in) 2.0mm (0.079in) After the backlash has been properly adjusted, re-apply bluing compound to the gears, and reinstall them in the gearbox. While holding the output shaft (furthest away from the hole plug) to apply a light load to it, rotate the input shaft (ball bearing visible) clockwise several revolutions, as viewed from the end of the shaft.

This will seat the rollers, and also will mark the contact pattern in the bluing compound on the gear teeth. If the gear contact pattern is not correct, both shafts must be moved an equal amount in order to correct the contact pattern, as follows: If the contact pattern is high on input gear tooth and low on output, move input shaft out and output shaft in. If the contact pattern is low on input gear tooth and high on output, move output shaft out and input shaft in. Use the same procedure described in Backlash Adjustment to move the shafts in or out. After adjusting the shafts, recheck the backlash to ensure it has not changed.

Continue to apply bluing compound to check and adjust gear pattern until it is correct. 10. Fill the area around the bearings with grease CASE AKCELA PREMIUM GREASE EP-2 , and install the seal (1) , seal plate (2) , and retaining ring (3) on each shaft. Install the retaining rings (4) that locate the sprockets. 20014631B5 9 9723 1 27/05/2004 K.72.B / 46