Case IH AFX8010 — UNLOADING Grain unloading

CROP PROCESSING - UNLOADING Grain unloading Unloading tube - Install (K.72.B.71 - F.10.A.15) AFX8010 1. The unloading tube is heavy and appropriate lifting equipment is required. Use a minimum of two slings, separated with a minimum 2.4 m ( 8 ft ) wide spreader bar to keep the slings in position. Failure to do so may result in the auger becoming unbalanced and dropping suddenly. 50041762 1 2. To install the unloading tube, first hoist the unload tube with auger in place on to the left side of the combine and guide the auger into the unload elbow tube and make sure auger spline (4) fits over gearbox sprocket (4) of figure 3 .

Align square hole (5) with square hole (5) of the elbow, in figure 3 . ZDA3577A 2 3. View of unloading tube gearbox and drive sprocket in unload tube elbow. ZDA3575A 3 9723 1 27/05/2004 K.72.B / 59