Ascertain the completeness of the delivery (including all accessories and the tandem roller documentation). Initial operation 5 - 5 Issue: 01-10 Refer to the chapter Note of delivery and verifi cation of inspections in the operating manual for information on the default maintenance intervals (maintenance certifi cates). NOTE Carry out the maintenance work described below in the presence of the operating staff (i.e. the driver of the tandem roller) and the service staff of the customer. Refer to the corresponding sections of the operating and maintenance manual. i Check whether the following fi ll levels correspond to the required levels as stated in the maintenance manual: NOTE!
Make sure all checks and maintenance measures required for the initial operation are carried out in the presence of the customer and his/her staff. Obtain a written confi rmation. i Check the hydraulic hoses and screw connections for leaks Testing the operating state of the tandem roller Make a note of any damage found. Check all screw connections Engine oil level Hydraulic oil level 5.1.4 Maintenance instructions referring to the initial operation Delivery receipt: Checking the fi ll levels: Screw connections: Hydraulic system: