Mitsubishi Heavy Industries — MAINTENANCE STANDARDS

Unit: mm (in.) \0 -..J -e ~ '" ~ ~ ::3 ""' p. E " p. ""Cl " ~ "0 " [.L. Delivery capacity 900 cc (55 cu in.)/min, min 600 cc (37 Cll in.)/min, min Check displacement with injection pump operated at 1000 rpm with a discharge pressure of 1.5 kg/ cm2 (21 psi). Air-tightness Not greater than 50 ee (3.1 eu in.)/min (with bubbles not larger than 2 rom (0.08 in.) in size.) Close pump discharge port with a plug. Apply an air pressure of 2 kg/cm2 (28 psi) to the pump, and keep the pump immersed in diesel fuel longer than 1 minute. Operate injection pump at 150 rpm to check the length of time required for the feed pump to start discharging.

Pumping performance 40 seconds, max 50 seconds Number of strokes for pumping (priming pump) 25, max 30 Operate priming pump handle at a speed of 60 strokes/ minute. Check the number of strokes required for making the pump start discharging at a head of 1 meter (39-3/8 in.). p. E p". c .g u " .'c-:' -.; " [.L. Plunger oil-tightness 150~200 kg/cm2 (2133 ~ 2844 psi),min 150 kg/cm2 (2133 psi), max Pump rpm: 200 Delivery valve seating tightness See Remarks. 10 kg/cm2 (142 psi) pressure drop should not exceed 5 seconds.

Backlash between pinion and rack - (0.15 (0.0059) I (0.25 I (0.0098) - Rack sliding resistance 150 g (5.3 ()z), max with pump at stand-still; 50 g (1.8 oz), max with pump running at 1000 rpm Fit of tappets in pump housing j-------- 15 (0.591) ( 0.02 ~0.062 I (0.00079 ~ 0.00244) ( 0.25 I (0.0098) f--. Outside diameter of tappet rollers o 0 -0.027 -0.075 ( -·0.00295) -------- Plunger springs Free length -I---' 49.4 0.945) +1 to.039) o 0 -0.5 (-0.020) -- As-installed length 44 (1.732) , Free length of delivery valve spring 32 (1.260) ± 0.5 (± 0.020) 1------ -I (-0.039) Cam height (major diam) 32 (1.260) o ~0.1 (0 ~0.004) -0.2 ( -0.0078) Replace camshaft. Check cam surface for condition.