3.3. Operation Operation Levelling NOTE Always operate the machine in reverse when carrying out levelling operations. If it is necessary to perform levelling works when travelling forward, do not set the bucket dumping angle to more than 20°. 1. Scoop soil into the bucket. Move the machine backward while spreading soil from the bucket little by little. 2. Go over the spread soil with the bucket teeth touching the ground and level the ground by back-dragging. 3. Scoop some more soil into the bucket, set the lift arm to float position, level the bucket at ground level, and smooth the ground by moving backward. 4. Make sure that you have got clear sight behind you.
AE061970 Pushing NOTE Never set the bucket to the DUMP position when carrying out pushing operations. When carrying out pushing operations, set the bottom of the bucket parallel to the ground surface. Load-and-carry operations When carrying a load, lower the bucket to lower the center of gravity when travelling. The load-and-carry method for wheel loaders consists of the fol- lowing cycle: scooping hauling loading (into a hopper, glory hole, etc.) Always keep the travel path in proper condition. For using the load-and-carry method, see section "3.3.17. Tyre handling" on page 3-78. AE061980 3-68 CAUTION CAUTION