Introduction 1.7. CE-conforming equipment Manufacturer-supplied CE-conforming equipment, according to document 419-93-H1160 A1 Distance: bucket pivoting point - front axle, horizontal A2 Distance: bucket pivoting point - front axle, vertical Sh Distance: road level - front axle B1 Distance: driver's eye (1) - front axle, horizontal B2 Distance: driver's eye (1) - front axle, vertical C1 Distance: centre steering wheel - centre front axle, horizontal C2 Distance: center steering wheel - centre front axle, horizontal D1 Distance: headlight - centre front axle, horizontal D2 Distance: headlight - centre front axle, vertical G Weight of equipment and working load H1 Distance:
bucket pivoting point - bucket upper edge, vertical (carrying position) H2 Distance: bucket pivoting point - vision line, vertical (carrying position) J Distance: road level - bucket bottom edge (carrying position) b1 Bucket connection dimension, boom width inside b2 Bucket connection dimension, boom arm b3 Bucket connection dimension, tilt rod b4 Bucket connection dimension, temporary size c Bucket connection dimension between d1 and d2, vertical d1 Bucket connection dimension, bolt (3) for boom d2 Bucket connection dimension, bolt (3) for tilt rod e Bucket connection dimension d1 - d2, horizontally displaced h Distance: bucket bottom edge - boom bolt hole l Distance:
centre of bolt -- centre of fastening screw 1-23 WA500-3H 419-93-H1160 A1 2,290 A2 1,416 Sh 876 / 813* B1 2,244 B2 2,410 C1 1,742 C2 2,007 D1 550 D2 1,443 G 10,900 H1 1,795 H2 1,670 J 270 b1 1,020 ± 1.5 b2 180 ± 1.5 b3 145 ± 1.5 b4 437.5 ± 1.5 c 437 ± 1.5 d1 110 + 0.1 d2 110 + 0.1 e 0 h 320 l 120 1 Driver´s eye 2 Vision line 3 Bolt Tyres MICHELIN 29.5R25 XHA / 26.5R25 XHA* Bucket 5 m³ - 425-70-H2260 3750C31