5.8. Service procedure Maintenance Checking the accumulator Check the gas pressure of the accumulator as follows. Checking 1. Stop the machine on level ground and apply the parking brake. 2. Raise the work equipment to the maximum height, then place the lift arm control lever at HOLD. 3. Leave the work equipment in this position, and stop the engine. Maximum height 4. Confirm that it is safe around the machine, then set the lift arm at FLOAT and lower the work equipment to a position 1 m (3.28 ft) from the ground. FLOAT- 5. When the work quipment reaches a position 1 m from the ground, move the lift arm control lever to LOWER, and lower the work equipment slowly to the ground. LOWER 1 m G.L.
GK100600 If the work equipment stops moving during checking, the gas pressure may be below the service limit (7 bar, 99.4 PSI), so contact your Komatsu distributor to have the gas pressure measured or gas charged. Carry out the checks within five minutes of stopping the engine. If the machine is left with the engine stopped, the accumulator pres- sure will drop and it will be impossible to carry out the check. Checking the ECSS-accumulator gas pressure Please ask your Komatsu distributor to check the accumulator gas pressure. 5-72